PJSC "Fortum" 

Chelyabinsk CHPP-2

In 2019, the ventilation systems of the lime facility of the boiler and turbine shop of the Chelyabinsk CHPP-2 were reconstructed.

Three exhaust systems with VEZA medium-pressure centrifugal fans and two VEROSA supply systems with water heaters were installed.

In addition, modern automation systems based on Carel controllers have been installed, and heat supply pipelines have been laid.